Lafarge France has signed a Front End Engineering Design (FEED) contract with Air Liquide for the eCapt‑Rhône du Teil project, marking a major step toward launching a CO₂ capture facility at the Le Teil cement plant. The installation is expected to begin operating in 2029 and will convert captured carbon into low‑carbon e‑methanol.