SECTIONS

HomeArticlesPodcastsJobs

Equatic to Build North America’s First Commercial-Scale Ocean-Based Carbon Removal Facility

June 21, 2024

BY Equatic

Advertisement

Advertisement

Related Stories

DNV Gives Greenlight to New Methodology for Carbon Removals Delivered by BECCS

Article image

By Drax

June 21, 2024

CaptureStorage

A methodology developed by renewable energy pioneers Drax and Stockholm Exergi has been validated by DNV, an organization which delivers world-renowned testing, certification and technical advisory services to the energy sector.

Read More

Piñon Midstream, LLC announced that it has received approval from the United States Environmental Protection Agency for its monitoring, reporting and verification plan for the permanent sequestration of carbon dioxide, a greenhouse gas, in its two acid gas injection wells located at Piñon’s Dark Horse Treating Facility in Lea County, New Mexico.

Read More

The SSCV Sleipnir from Heerema Marine Contractors set sail in June 2024 with a very special cargo on board: the EverLoNG ship-based carbon capture (SBCC) prototype. The objective of the Sleipnir campaign is to test all aspects of the capture and onboard storage system on the liquefied natural gas-fuelled vessel.

Read More

SLB and Aker Carbon Capture announced the closing of their previously announced joint venture. The new company combines technology portfolios, expertise and operations platforms to support accelerated carbon capture adoption for industrial decarbonization at scale.

Read More

Finnish forest industry company Metsä Group has entered into a cooperation with international technology group ANDRITZ to explore the integration of carbon capture into a bioproduct mill. ANDRITZ will conduct a process concept study to seamlessly integrate carbon capture into the bioproduct mill process in the most energy-efficient manner.

Read More

Upcoming Events

Sign up for our e-newsletter!
BBI International Logo

@ Copyright 2024 - BBI International - All rights reserved.